Put a heavier number on the
bar.
Percentage work, longer rests, lower reps and a planned peak. Slower than it looks, and the only honest way to add real load.

bar.
Percentage work, longer rests, lower reps and a planned peak. Slower than it looks, and the only honest way to add real load.
